Capture · Anchor Inn Leeds
Showing what is due for Nov 2026. 5 items open, 19 done. Enter each value for the period on the document; a bill that runs 20th to 20th is fine.
- Business viabilityECO-06Nov 2026Draft saved9 data pointsViability
Occupancy, ADR/RevPAR, revenue and profitability trend · Evidence: Financial records
Previous: 61 % (Oct 2026) · 59 % (Sept 2026) · 60 % (Aug 2026)
- Energy consumptionENV-01Nov 20263 meters / sources3 data pointsEnergy
Energy used per source series (grid electricity, gas, LPG, oil, diesel, district heat, on-site solar), entered in native units or cost, normalised to kWh; export netted off · Evidence: Utility bill / fuel invoice
- Water consumptionENV-07Nov 2026Draft saved2 meters / sources5 data pointsWater
Water used per source series (mains, borehole, tanker, rain, recycled), entered in L, m³ or cost, normalised to litres; source and method documented · Evidence: Water bill / meter photo
- Linen reuse & cleaning opt-outENV-09Q4 20265 data pointsWater
Programme offered, and % of stays that take it up · Evidence: Housekeeping log
Previous: 38 % (Jul 2026) · 37 % (Apr 2026) · 40 % (Jan 2026)
- Waste generated & divertedENV-11Nov 2026Draft saved3 meters / sources7 data pointsWaste
Waste per stream series (residual landfill/incineration, recycling by stream, organic, hazardous) in kg, tonnes, bin lifts or cost; total, residual and diversion rate derived; ≥3 separation streams for staff and guests · Evidence: Hauler ticket / scale log