Economy
Viability
Business viability from occupancy, ADR or RevPAR and profitability trend (ECO-06), and a risk assessment with a continuity or adaptation plan covering climate, regulatory and supply risks (ECO-07).
Why it matters. A property that is not viable cannot sustain anything else. Lenders and insurers increasingly require the risk assessment.
Viability score
–
of 100
Not switched on here
Charts
Viability · per occupied room-night by month
Report byto··
Business viabilityECO-06
% · target 80
Score
–
Readings stay as entered and are spread evenly across their days, then re-added into months. Solid = submitted · faded = mostly estimated · dashed = draft · line = target. Breakdowns are one line per meter, fuel, source or stream; carbon is derived by scope.
Show entered data (152 records this year)Hide entered data
Occupancy, ADR/RevPAR, revenue and profitability trend · evidence: Financial records
%
–
Reference target (no baseline yet)
80
Floor (=0)
30
Score
–
| Period | Value | Status | Evidence | Captured |
|---|---|---|---|---|
| Jan 2026ECO-06.8 | 1,900 | Submitted | none attached | 19/11/2026 |
| Jan 2026ECO-06.9 | 1 | Submitted | Owned (self) | 19/11/2026 |
Resilience & future-proofingECO-07
Risk assessment (climate, regulatory, supply) and a continuity or adaptation plan · evidence: Risk assessment
In place
–
Score
–
| Period | Value | Status | Evidence | Captured |
|---|---|---|---|---|
| 2026ECO-07.3 | Yes | Submitted | none attached | 19/11/2026 |
How to track this well
- 1Enter occupancy (and revenue trend if you choose to share it) monthly from the PMS.
- 2Complete a simple risk assessment: hazards, likelihood, impact, mitigation, owner; attach it.
- 3Review the assessment every two to three years or after a major event.
Where the data comes from
- · PMS / finance
- · GM and chief engineer
- · Insurer or consultant reports
Evidence to attach
PMS or finance extract; risk assessment document.
Cadence and owner
Monthly (finance); risk assessment every 2–3 years.
Common pitfalls
- · A risk assessment with no mitigation actions or owner
Readiness checklist
1 of 2 attributes up to date
- Occupancy, ADR/RevPAR, revenue and profitability trendUp to date · 2 records this year
9 data points to enter
- ECO-06.1Occupancypct
- ECO-06.2Occupied room-nights (denominator)count
- ECO-06.3Rooms availablecount
- ECO-06.4Guest-nightscount
- ECO-06.5Covers servedcount
- ECO-06.6Revenuemoney
- ECO-06.7Floor area · meeting-space area · FTEtext
- ECO-06.8Floor areacount · SASB SV-HL-000.C
- ECO-06.9Ownership model (owned / leased / managed / franchised)pick · SASB SV-HL-000.D
- !Risk assessment (climate, regulatory, supply) and a continuity or adaptation planAttach evidence (risk assessment) · 1 record this year
3 data points to enter
- ECO-07.1Resilience & future-proofingbool · GSTC A1 (climate risk)
- ECO-07.2Risk assessmentdoc
- ECO-07.3In a 100-year flood zonebool · SASB SV-HL-450a.1