Harbourline Hotels
DemoViewing asYou can try everything, but nothing you change is saved.

Environment

Active

This is where most groups start. You capture the bills and meter reads you already receive, Canoprise turns them into per-room-night intensities so months and properties compare fairly, and your carbon footprint is derived from the same numbers using the HCMI method for your region.

You capture
  • · Electricity, gas and fuel
  • · Water
  • · Waste to landfill and recycling
  • · Scope 1 & 2 carbon
  • · Biodiversity and single-use plastics
It feeds
  • · HCMI / HWMI
  • · GSTC Hotel Standard section D
  • · WTTC Basics
  • · EU VS environment datapoints
Environment score
86
of 100
Enter dataDimension guide (PDF)
Energy
76avg 72

Energy used per room-night, renewables, LED and efficiency controls.

Water
86avg 79

Water used per room-night, efficient fixtures, linen reuse and outdoor water.

Waste
100avg 70

Landfill waste per room-night, diversion rate, plastics, reusables, hazardous waste, paperless.

Carbon & pollution
78avg 84

Scope 1 and 2 footprint per room-night, your reduction target and any offsets.

Nature & food
88avg 71

Local and organic food, food waste, plant-forward menus, biodiversity, eco products, low-carbon mobility.

Charts

Processed by month

Report by
to··

Readings are kept exactly as entered (a monthly bill stays a monthly bill) and are spread evenly across their days; the chart re-adds those days into months. Solid = submitted · faded = mostly estimated · dashed = draft · line = target per room-night.

Energy consumption
kWh per occupied room-night · entered monthly · Utility bill / fuel invoice
Score
70
2026 to date 37.91
target 36.28
floor 90
010203040Jan: 30.6 kWhJanFeb: 31.5 kWh (estimated)FebMar: 34.7 kWhMarApr: 30.4 kWhAprMay: 34.4 kWhMayJun: 33.7 kWh (estimated)JunJul: 32.5 kWhJulAug: 34.5 kWhAugSep: 32.7 kWhSepOctNovtarget
Main electricity meter 60%Gas (boilers & kitchen) 40%
Renewable electricity
% · entered annual · Supplier contract / certificate
Score
55
2026 to date 39.4
target 36.48
floor 0
010203040Jan: 0.1 %JanFeb: 0.1 %FebMar: 0.1 %MarApr: 0.1 %AprMay: 0.1 %MayJun: 0.1 %JunJul: 0.1 %JulAug: 0.1 %AugSep: 0.1 %SepOct: 0.1 %OctNov: 0.1 %Novtarget
Year-on-year energy reduction
% · entered annual · Derived from bills
Score
67
2026 to date 2.2
target 2.24
floor -5
0123Jan: 0 %JanFeb: 0 %FebMar: 0 %MarApr: 0 %AprMay: 0 %MayJun: 0 %JunJul: 0 %JulAug: 0 %AugSep: 0 %SepOct: 0 %OctNov: 0 %Novtarget
Efficient lighting
% · entered annual · Lighting audit / photos
Score
66
2026 to date 92.4
target 91.02
floor 80
0255075100Jan: 0.3 %JanFeb: 0.3 %FebMar: 0.3 %MarApr: 0.3 %AprMay: 0.3 %MayJun: 0.3 %JunJul: 0.3 %JulAug: 0.3 %AugSep: 0.3 %SepOct: 0.3 %OctNov: 0.3 %Novtarget
Water consumption
L per occupied room-night · entered monthly · Water bill / meter photo
Score
89
2026 to date 325.76
target 322.86
floor 800
0100200300400Jan: 316.5 LJanFeb: 274.4 LFebMar: 275.7 LMarApr: 301.5 LAprMay: 275.7 L (estimated)MayJun: 299.7 LJunJul: 299.6 LJulAug: 261.5 LAugSep: 295.8 LSepOct: 312.8 LOctNovtarget
Mains water 100%
Water-efficient fixtures
% · entered annual · Fixture audit
Score
69
2026 to date 69.9
target 68.61
floor 10
020406080Jan: 0.2 %JanFeb: 0.2 %FebMar: 0.2 %MarApr: 0.2 %AprMay: 0.2 %MayJun: 0.2 %JunJul: 0.2 %JulAug: 0.2 %AugSep: 0.2 %SepOct: 0.2 %OctNov: 0.2 %Novtarget
Linen reuse & cleaning opt-out
% · entered quarterly · Housekeeping log
Score
70
2026 to date 48
target 47.92
floor 0
0204060Jan: 0.5 %JanFeb: 0.5 %FebMar: 0.5 %MarApr: 0.5 %AprMay: 0.5 %MayJun: 0.5 %JunJul: 0.5 %JulAug: 0.5 %AugSep: 0.5 %SepOctNovtarget
Waste generated & diverted
kg per occupied room-night · entered monthly · Hauler ticket / scale log
Score
99
2026 to date 0.45
target 0.46
floor 2.5
00.20.40.60.8Jan: 0.7 kg (estimated)JanFeb: 0.7 kgFebMar: 0.7 kgMarApr: 0.7 kgAprMay: 0.7 kgMayJun: 0.7 kgJunJul: 0.7 kg (estimated)JulAug: 0.8 kgAugSep: 0.7 kgSepOctNovtarget
General waste (residual) 55%Mixed recycling 30%Glass 15%
GHG footprint
kgCO2e per occupied room-night · entered monthly · Calculation (method documented)
Score
83
2026 to date 9.35
target 9.18
floor 35
02.557.510Jan: 7.6 kgCO2eJanFeb: 7.8 kgCO2e (estimated)FebMar: 8.6 kgCO2eMarApr: 7.5 kgCO2eAprMay: 8.5 kgCO2eMayJun: 8.3 kgCO2e (estimated)JunJul: 8 kgCO2eJulAug: 8.5 kgCO2eAugSep: 8 kgCO2eSepOctNovtarget
Scope 1 45.9 tScope 2 107.1 t· derived from energy by source × emission factor
Reduction target & offsets
% · entered annual · Target statement / offset certificates
Score
52
2026 to date 32.5
target 31.32
floor 0
010203040Jan: 0.1 %JanFeb: 0.1 %FebMar: 0.1 %MarApr: 0.1 %AprMay: 0.1 %MayJun: 0.1 %JunJul: 0.1 %JulAug: 0.1 %AugSep: 0.1 %SepOct: 0.1 %OctNov: 0.1 %Novtarget
Local & organic food
% · entered quarterly · Invoices / purchase log
Score
67
2026 to date 39.7
target 38.13
floor 5
010203040Jan: 0.5 %JanFeb: 0.5 %FebMar: 0.5 %MarApr: 0.4 %AprMay: 0.4 %MayJun: 0.4 %JunJul: 0.4 %JulAug: 0.4 %AugSep: 0.4 %SepOctNovtarget
Food waste
kg per occupied room-night · entered monthly · Kitchen scale log
Score
73
2026 to date 0.23
target 0.24
floor 0.6
00.10.20.3Jan: 0.2 kgJanFeb: 0.2 kgFebMar: 0.2 kgMarApr: 0.2 kgAprMay: 0.2 kgMayJun: 0.2 kgJunJul: 0.2 kgJulAug: 0.2 kgAugSep: 0.2 kg (estimated)SepOct: 0.2 kgOctNov: 0.2 kg (draft)Novtarget
Kitchen food waste 100%
Eco-labelled products
% · entered annual · Purchase records / certificates
Score
73
2026 to date 88.1
target 85.08
floor 50
0255075100Jan: 0.2 %JanFeb: 0.2 %FebMar: 0.2 %MarApr: 0.2 %AprMay: 0.2 %MayJun: 0.2 %JunJul: 0.2 %JulAug: 0.2 %AugSep: 0.2 %SepOct: 0.2 %OctNov: 0.2 %Novtarget
Practices & policies

What is in place

Efficiency equipment & controls
Keycard switches, efficient appliances, smart thermostats, insulation, glazing; coil and filter cleaning schedule
In place · On change
Low-impact refrigerants
Cooling uses natural or low-GWP refrigerants and is HFC-free
In place · On change
Outdoor water management
Drought-tolerant landscaping and/or rainwater harvesting in place
In place · On change
Single-use plastics removed
Bottles, straws, stirrers, individual amenities and styrofoam eliminated; checklist of what remains
In place · On change
Refill & reusables
Refill stations and reusable tableware or cups in use
In place · On change
Hazardous waste, chemicals & pesticides
Hazardous-waste list and licensed transport records; chemical inventory with safety data sheets; disinfection SOP; agrochemical application log; bulbs/WEEE recycled
In place · Annual
Paperless operations
Paperless front- and back-office procedures
In place · On change
Plant-forward menu
Vegetarian and vegan options offered on every menu
In place · On change
Biodiversity protection
Protected areas and species identified; count of biodiversity actions per year with a bi-annual review; native, non-invasive landscaping; ecological green-area management
In place · On change
Low-carbon mobility
EV charging points, bicycle rental/parking, staff sustainable-commute measures, electric share of property vehicles, guest public-transport information
In place · On change
Wastewater & water risk
All wastewater treated (connection or permitted on-site system); grease trap serviced; water-risk assessment within 6 years; legal water source
In place · Annual
Pollution & nuisance controls
Smoking policy and areas; outdoor lighting minimised; noise, light, runoff and erosion controls; refrigerant leak log
In place · Annual
Animal welfare & wildlife trade
No captive or exploited wildlife or harmful animal entertainment; welfare guidelines where animals are kept; no threatened species on menus or sold; plants, animals and artefacts traded legally
In place · Annual

Other categories: People · Community & culture · Economy