Harbourline Hotels
DemoViewing asYou can try everything, but nothing you change is saved.

Capture · Harbourline Grand

Showing what is due for Nov 2026. 1 items open, 5 done. Enter each value for the period on the document; a bill that runs 20th to 20th is fine.

Data grid
Showing Energy only. Show everything due
Environment1 due
  • Energy consumptionENV-01Nov 2026Draft saved4 meters / sources3 data pointsEnergy

    Energy used per source series (grid electricity, gas, LPG, oil, diesel, district heat, on-site solar), entered in native units or cost, normalised to kWh; export netted off · Evidence: Utility bill / fuel invoice

    Data point
    Meter / source / stream
    Period on the document
    to
    Quantity as on the bill
    Cost (optional)
    Evidence (optional) · Utility bill / fuel invoice
    Last entry on Main electricity meter: 52,421.2 kWh (Nov 2026)
    Asked for by: GK 4.1 · GSTC D1 · WTTC #1
Already submitted for this period