Harbourline Hotels
DemoViewing asYou can try everything, but nothing you change is saved.

Environment

Active

This is where most groups start. You capture the bills and meter reads you already receive, Canoprise turns them into per-room-night intensities so months and properties compare fairly, and your carbon footprint is derived from the same numbers using the HCMI method for your region.

You capture
  • · Electricity, gas and fuel
  • · Water
  • · Waste to landfill and recycling
  • · Scope 1 & 2 carbon
  • · Biodiversity and single-use plastics
It feeds
  • · HCMI / HWMI
  • · GSTC Hotel Standard section D
  • · WTTC Basics
  • · EU VS environment datapoints
Environment score
74
of 100
Enter dataDimension guide (PDF)
Energy
72avg 66

Energy used per room-night, renewables, LED and efficiency controls.

Water
68avg 81

Water used per room-night, efficient fixtures, linen reuse and outdoor water.

Waste
97avg 91

Landfill waste per room-night, diversion rate, plastics, reusables, hazardous waste, paperless.

Carbon & pollution
80avg 82

Scope 1 and 2 footprint per room-night, your reduction target and any offsets.

Nature & food
54avg 83

Local and organic food, food waste, plant-forward menus, biodiversity, eco products, low-carbon mobility.

Charts

Processed by month

Report by
to··

Readings are kept exactly as entered (a monthly bill stays a monthly bill) and are spread evenly across their days; the chart re-adds those days into months. Solid = submitted · faded = mostly estimated · dashed = draft · line = target per room-night.

Energy consumption
kWh per occupied room-night · entered monthly · Utility bill / fuel invoice
Score
55
2026 to date 60.89
target 58.63
floor 90
0204060Jan: 58.7 kWh (estimated)JanFeb: 55.6 kWh (estimated)FebMar: 51.1 kWhMarApr: 52.5 kWhAprMay: 55 kWhMayJun: 58.9 kWhJunJul: 60 kWhJulAug: 56.5 kWhAugSep: 52.9 kWhSepOct: 52.7 kWhOctNov: 59.4 kWh (draft)Novtarget
Main electricity meter 52%Kitchen & boiler LPG 31%Backup generator diesel 7%Rooftop solar PV 11%
Renewable electricity
% · entered annual · Supplier contract / certificate
Score
52
2026 to date 33.1
target 31.83
floor 0
010203040Jan: 0.1 %JanFeb: 0.1 %FebMar: 0.1 %MarApr: 0.1 %AprMay: 0.1 %MayJun: 0.1 %JunJul: 0.1 %JulAug: 0.1 %AugSep: 0.1 %SepOct: 0.1 %OctNov: 0.1 %Novtarget
Year-on-year energy reduction
% · entered annual · Derived from bills
Score
71
2026 to date 2.1
target 2.09
floor -5
0123Jan: 0 %JanFeb: 0 %FebMar: 0 %MarApr: 0 %AprMay: 0 %MayJun: 0 %JunJul: 0 %JulAug: 0 %AugSep: 0 %SepOct: 0 %OctNov: 0 %Novtarget
Efficient lighting
% · entered annual · Lighting audit / photos
Score
55
2026 to date 87.7
target 86.37
floor 80
0255075100Jan: 0.2 %JanFeb: 0.2 %FebMar: 0.2 %MarApr: 0.2 %AprMay: 0.2 %MayJun: 0.2 %JunJul: 0.2 %JulAug: 0.2 %AugSep: 0.2 %SepOct: 0.2 %OctNov: 0.2 %Novtarget
Water consumption
L per occupied room-night · entered monthly · Water bill / meter photo
Score
30
2026 to date 651.15
target 605.5
floor 800
0200400600800Jan: 593.7 LJanFeb: 614.3 L (estimated)FebMar: 614.3 LMarApr: 533 LAprMay: 552.3 LMayJun: 641.2 LJunJul: 557.1 LJulAug: 568.5 LAugSep: 568 LSepOct: 568.4 LOctNovtarget
Mains water 74%Borehole 26%
Water-efficient fixtures
% · entered annual · Fixture audit
Score
48
2026 to date 57.3
target 58.89
floor 10
0204060Jan: 0.2 %JanFeb: 0.2 %FebMar: 0.2 %MarApr: 0.2 %AprMay: 0.2 %MayJun: 0.2 %JunJul: 0.2 %JulAug: 0.2 %AugSep: 0.2 %SepOct: 0.2 %OctNov: 0.2 %Novtarget
Linen reuse & cleaning opt-out
% · entered quarterly · Housekeeping log
Score
62
2026 to date 37
target 36.38
floor 0
010203040Jan: 0.4 %JanFeb: 0.4 %FebMar: 0.4 %MarApr: 0.4 %AprMay: 0.4 %MayJun: 0.4 %JunJul: 0.4 %JulAug: 0.4 %AugSep: 0.4 %SepOctNovtarget
Waste generated & diverted
kg per occupied room-night · entered monthly · Hauler ticket / scale log
Score
85
2026 to date 0.67
target 0.66
floor 2.5
00.511.5Jan: 1.1 kgJanFeb: 1 kgFebMar: 1 kgMarApr: 1.2 kgAprMay: 1 kgMayJun: 1.1 kgJunJul: 1 kg (estimated)JulAug: 1.1 kgAugSep: 1.1 kg (estimated)SepOctNovtarget
General waste (residual) 55%Mixed recycling 30%Glass 15%
GHG footprint
kgCO2e per occupied room-night · entered monthly · Calculation (method documented)
Score
90
2026 to date 9.68
target 9.6
floor 35
02.557.510Jan: 9.3 kgCO2e (estimated)JanFeb: 8.8 kgCO2eFebMar: 8.1 kgCO2eMarApr: 8.4 kgCO2eAprMay: 8.7 kgCO2eMayJun: 9.4 kgCO2eJunJul: 9.5 kgCO2eJulAug: 9 kgCO2eAugSep: 8.4 kgCO2eSepOct: 8.4 kgCO2eOctNov: 9.5 kgCO2e (draft)Novtarget
Scope 1 204.6 tScope 2 193.8 t· derived from energy by source × emission factor
Reduction target & offsets
% · entered annual · Target statement / offset certificates
Score
49
2026 to date 28.4
target 26.93
floor 0
0102030Jan: 0.1 %JanFeb: 0.1 %FebMar: 0.1 %MarApr: 0.1 %AprMay: 0.1 %MayJun: 0.1 %JunJul: 0.1 %JulAug: 0.1 %AugSep: 0.1 %SepOct: 0.1 %OctNov: 0.1 %Novtarget
Local & organic food
% · entered quarterly · Invoices / purchase log
Score
61
2026 to date 33.3
target 32.82
floor 5
010203040Jan: 0.4 %JanFeb: 0.4 %FebMar: 0.4 %MarApr: 0.4 %AprMay: 0.4 %MayJun: 0.4 %JunJul: 0.3 %JulAug: 0.3 %AugSep: 0.3 %SepOctNovtarget
Food waste
kg per occupied room-night · entered monthly · Kitchen scale log
Score
60
2026 to date 0.35
target 0.35
floor 0.6
00.10.20.30.4Jan: 0.3 kgJanFeb: 0.3 kg (estimated)FebMar: 0.3 kgMarApr: 0.3 kgAprMay: 0.3 kgMayJun: 0.3 kgJunJul: 0.3 kg (estimated)JulAug: 0.3 kgAugSep: 0.3 kgSepOct: 0.3 kgOctNov: 0.3 kg (draft)Novtarget
Kitchen food waste 100%
Eco-labelled products
% · entered annual · Purchase records / certificates
Score
55
2026 to date 69.7
target 70.25
floor 50
020406080Jan: 0.2 %JanFeb: 0.2 %FebMar: 0.2 %MarApr: 0.2 %AprMay: 0.2 %MayJun: 0.2 %JunJul: 0.2 %JulAug: 0.2 %AugSep: 0.2 %SepOct: 0.2 %OctNov: 0.2 %Novtarget
Practices & policies

What is in place

Efficiency equipment & controls
Keycard switches, efficient appliances, smart thermostats, insulation, glazing; coil and filter cleaning schedule
In place · On change
Low-impact refrigerants
Cooling uses natural or low-GWP refrigerants and is HFC-free
In place · On change
Outdoor water management
Drought-tolerant landscaping and/or rainwater harvesting in place
In place · On change
Single-use plastics removed
Bottles, straws, stirrers, individual amenities and styrofoam eliminated; checklist of what remains
In place · On change
Refill & reusables
Refill stations and reusable tableware or cups in use
In place · On change
Hazardous waste, chemicals & pesticides
Hazardous-waste list and licensed transport records; chemical inventory with safety data sheets; disinfection SOP; agrochemical application log; bulbs/WEEE recycled
In place · Annual
Paperless operations
Paperless front- and back-office procedures
In place · On change
Plant-forward menu
Vegetarian and vegan options offered on every menu
Not in place · On change
Biodiversity protection
Protected areas and species identified; count of biodiversity actions per year with a bi-annual review; native, non-invasive landscaping; ecological green-area management
In place · On change
Low-carbon mobility
EV charging points, bicycle rental/parking, staff sustainable-commute measures, electric share of property vehicles, guest public-transport information
In place · On change
Wastewater & water risk
All wastewater treated (connection or permitted on-site system); grease trap serviced; water-risk assessment within 6 years; legal water source
In place · Annual
Pollution & nuisance controls
Smoking policy and areas; outdoor lighting minimised; noise, light, runoff and erosion controls; refrigerant leak log
In place · Annual
Animal welfare & wildlife trade
No captive or exploited wildlife or harmful animal entertainment; welfare guidelines where animals are kept; no threatened species on menus or sold; plants, animals and artefacts traded legally
Not in place · Annual

Other categories: People · Community & culture · Economy